Before work could commence significant work was required to take back existing studwork, insulation, ceiling and services
Large concrete butresses significantly constrained the existing space. These had to be removed by hand in order to provide a livable space
To remove the existing steelwork the kitchen floor above was fully propped
Steel beams and a support column are installed to allow underpinning to safely proceed
Work commences on maximising the basement space and supporting the walls above by underpinning